RECENT ASSIGNMENT

Tweet Share WhatsApp Share
GET ANSWERS / LIVE CHAT


Subject Title Project Management
Subject Code BUS304
Assessment Title Assessment 1 – Cast Study Analysis
Graduate Capabilities
1. Professional Expertise
2. Innovative Problem Solving
3. Technology and information literacy
6. Agile leadership
7. Independent self-management
Learning Outcome/s (found in the Subject Outline) a) Assess project management design, development and deployment
b) Formulate the lifecycle of a project with prioritized project
components
c) Recommend project management tools, techniques and skills to be an effective project management team member
d) Solve project variations
Assessment type (group or individual) Individual
Weighting % 30%
Word count 1500
Due day Week 4 Sunday 11:55 pm.
Submission type Turnitin ?
Format / Layout of Assessment
Report:
ICMS Cover Page
Table of Contents
Executive Summary
Introduction
Findings
Conclusion
?
?
?
?
?
?
Recommendations
Reference List
Appendices ?
?
?
Assessment instructions
Please select any one of the video cases below as a reference for your report.
• 7 Days Out with KARL LAGERFELD | CHANEL | Paris Fashion
Week [Documentary] - https://youtu.be/dC_RipiL9uc
• Benjamin Franklin Plumbing featured on AMC's The Pitch https://youtu.be/vThMZOm79DM
• National Geographic - Inside Rio Carnaval (2007) https://youtu.be/xgaVj0wSw2A
• The Making of Barangaroo: https://youtu.be/_EZKWYbWauE • The Wedding Planner: https://youtu.be/QrcgaBM82EE
• Building A Tiny House From Start To Finish: https://youtu.be/R9npBuS9AsE
• Gumball 3000: https://youtu.be/XpO-Bn30cbo
• Panama Canal: https://youtu.be/YzCULxAmkRU
• Cirque Du Soleil's VOLTA: https://youtu.be/CuWZqVB691g
• Cirque Du Soleil's Journey to Alegría: https://youtu.be/sJ1914bbzZc
• Tomorrowland: https://youtu.be/bq6zbVLYz54
• MRT Malaysia: https://youtu.be/Er6SLFnv-Ro
• World's Longest Tunnel: https://youtu.be/TaYtrsvzfh0 • Icelandic Super Dam: https://youtu.be/qfdCfGML2hg
• Inside Terminal 4: Terminal of Tomorrow:
https://youtu.be/llh52RktRxU
• AVATAR (2009) - Making Of and Behind The Scenes:
https://youtu.be/_Y8Buy5b6DQ
Your task is to place yourself in the role of a project manager responsible for the smooth and successful planning and executing of this event. Based on what your see in the video and other considerations that are not necessarily shown here, list and discuss four of the most important project management concepts that are most relevant here.
There are several project management topics at play here (i.e. chartering projects, organizational culture and structure, scope planning, quality and risk management, stakeholder management, time & scheduling management, budgeting etc.).
Each concept should be detailed in terms of where you identify the issue, why you think it is so important in this project and use references from the literature that discuss the importance of this concept in projects (a least 2 unique sources per topic).
For example, if you identify that the budgeting is an important issue here, you will point out how and why and cite references that discuss cost-overruns being a common problem in projects. Some topics are clear as they are easy to see, while others may be implied and will need you to think critically and make conclusions about them.
The assignment takes the form of a report with the specified headings in the summary above –
Brief introduction
Body – 4 topics
Conclusion (2 – 3 sentences)
Recommendations
*The 1500 word count applies only to the body (Introduction, body, conclusion and recommendations).
The purpose of the report is to assess your ability to review a project case, identify project management issues, and make reference to supporting project management literature on the topic.
Readings for the assessment
Marion, J (2019) Project Management : A Common-Sense Guide to the
PMBOK Program, Part Two–Plan and Execution http://search.ebscohost.com/login.aspx?direct=true&AuthType=cookie,ip,sh ib&db=nlebk&AN=1918052&site=eds-live&scope=site&custid=s1320630
Marion, J (2019) Project Management : A Common-Sense Guide to the PMBOK Program, Part One-Framework and Schedule http://search.ebscohost.com/login.aspx?direct=true&AuthType=cookie,ip,sh ib&db=nlebk&AN=1703251&site=eds-live&scope=site&custid=s1320630
Grading Criteria / Rubric
Assessment?1 Case Study Analysis – Marking Rubric
Criteria HD (85-100) D (75-84) CR (65-74) PASS (50-64) FAIL (0-49)
Application of knowledge to
practice
30% Applies an in-depth level of critical thinking, research and analysis towards the impact of project management frameworks, concepts and methodologies on the process and outcome of the project. Integration of theory to practice as reflected in the case study and from other industry examples. Reflects a high level of professionalism in the quality and presentation of the discussion.
Customizes visual aids, tables and frameworks to further illustrate key aspects of the discussion. Evaluates the impact of project management methodologies on the process and outcome of the project. Integration of theory to practice as reflected in the case study and from other industry examples.
Supports evaluation with indepth research and consideration of examples and theory.
Utilizes frameworks, templates and visual aids in discussion. Demonstrates an understanding of the impact of project management methodologies on the process and outcome of the project. Demonstrates commercial awareness of project management.
Supports discussion with adequate level and amount of credible research. Understands the relevance of project management to the case.
Accesses relevant information. Adequately utilizes information from a variety of sources. Limited understanding of the relevance of project management concepts to the case.
Uses a limited range of information as the basis of recommended practice.
Knowledge and understanding (technical and theoretical
knowledge
30% A sophisticated understanding of the field or discipline/s.
Systematically and critically discriminates between assertion of personal opinion and information substantiated by robust evidence from the research/course Highly developed understanding of the field or discipline/s.
Discriminates between assertion of personal opinion and information substantiated by robust evidence from the research/course materials and extended reading.
Thorough knowledge or understanding of the field or discipline/s. Supports personal opinion and information substantiated by evidence from the research/course materials.
Demonstrates a capacity to explain and apply relevant concepts. Knowledge or understanding of the field or discipline.
Resembles a recall or summary of key ideas.
Often confuses assertion of personal opinion with information substantiated by evidence from the research/course materials. Limited understanding of required concepts and knowledge
Key components of the assignment are not addressed.
Page 4 of 5
Well demonstrated capacity to explain and apply relevant concepts.
Effective
Communication
20% Expertly presented; the presentation is logical, persuasive, and well supported by evidence, demonstrating a clear flow of ideas and arguments.
Engages and sustains audience’s interest in the topic, demonstrates high levels
of cultural sensitivity
Effective use of diverse presentation aids, including graphics and multi-media. Information, arguments and evidence are very well
presented; the presentation is logical, clear and well supported by evidence.
Demonstrates cultural sensitivity.
Information, arguments and evidence are well presented, mostly clear flow of ideas and arguments.
Line of reasoning is easy to follow. Information, arguments and evidence are presented in a way that is not always clear and logical.
Line of reasoning is often difficult to follow. Difficult to understand for audience, no logical/clear structure, poor flow of ideas, argument lacks supporting evidence.
Audience cannot follow the line of reasoning.
Correct citation of key resources and evidence
20% Demonstrates use of highquality, credible and relevant resources to support and develop arguments and position statements. Shows evidence of wide scope within and without the organization for sourcing evidence Demonstrates use of good quality, credible and relevant resources to support and develop arguments and statements. Shows evidence of wide scope within the organization for sourcing evidence Demonstrates use of high quality, credible and relevant resources to support and develop ideas. Demonstrates use of credible and relevant resources to support and develop ideas, but these are not always explicit or well developed. Demonstrates inconsistent use of good quality, credible and relevant resources to support and develop ideas.
Page 5 of 5



GET ANSWERS / LIVE CHAT