Assessment 2 Detail
This assessment requires students to (a) review the most recent literature (minimum 7 latest
publications of last five years) on integration and change management and the role of the project
manager as change manager and integrator; (b) critically evaluate the integrative nature of the
Project Charter and Project Management Plan along with their purpose within the Integration
Management processes and how what gets included in them supports the achievement of project
success (c) describe Integration, Change and Configuration Management and which do you think is
most important for project success and why?. Your work should include the following:
1. Abstract
2. Introduction
3. The body
a. Literature review ( each 100 words)
1. 1.https://www.ncbi.nlm.nih.gov/pmc/articles/PMC5890109/
2. 2.https://papers.ssrn.com/sol3/papers.cfm?abstract_id=3853560
3. 3.https://journals.sagepub.com/doi/full/10.1177/18479790211016273
4. 4.ARTICLE FROM JOURNAL OF NURSING MANAGEMENT
5. 5.The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders
6. JAMES KEHOE, MATTHEW DAVID HENRICKS, MICHAEL KENNETH YOUNG - Attitudes toward Change and Transformational Leadership: A Longitudinal Study
7. Need to find one more articles
b. Critically evaluate the integrative nature of the Project Charter and what gets
included in it supports the achievement of project success (600 words)
c. Describe Integration, Change and Configuration Management and which do you
think is most important for project success and why? (400-500 words)
4. Conclusion (100 words)
5. List of references (use Harvard Style)
Total 2200 words
GET ANSWERS / LIVE CHAT