Recent Question/Assignment

ASSESSMENT BRIEF
Subject Code and Title ACCT6001 Accounting Information Systems
Assessment Assessment 3: Case Study – Excel-based
Individual/Group Individual
Length
Learning Outcomes d) Apply technical knowledge and skills in creating information for the workplace using spreadsheets and relational databases e) Communicate with IT professionals, stakeholders and user groups of information systems
Submission By 11:55pm AEST/AEDT Sunday end of week 7/Module4.1
For intensive mode: By 11:55pm AEST/AEDT Sunday end of week 4/Module4.2
Weighting 25%
Total Marks 100 marks
Context:
The aim of this assessment is to assess the student’s ability to create spreadsheets that can aid business problem solving and analysing results.
The spreadsheet is a powerful tool that has become entrenched in business processes worldwide. A working knowledge of Excel is vital for most office based professionals today.
Submission Requirement:
Students need to submit their Excel Spreadsheet. The analysis and recommendation can be placed in the Excel worksheet. Note that your lecturer will provide you the case study for this assessment by week 4.
Criteria
• Formulae, formatting and cell references
• Graphs and pivot tables
• Cost-benefit analysis recommendation
ASSESSMENT 3 – Excel Case Study
Background:
Torrens Consulting Company is a privately owned, independent, wholly Australian operated leading specialised consultancy, providing a full range of management consulting services specialising in Human Resource Management, Executive Recruitment, Organisational Development, Organisational Psychology and Training and Development Services.
They are looking at changing their current consulting decision-making system to a new technology and would like to call it consulting business intelligence system. They are deciding whether to develop the system in-house or outsource the development.
Students need to create a cost-benefit analysis of the proposed new system using the spreadsheet.
Cost-Benefit Analysis Overview:
Conducting a Cost-Benefit Analysis
While it is important to provide decision-makers with a range of options, the process of developing and analysing these can be expensive and time consuming. For major investments, it may be necessary to outline various potential options and then to have decision-makers select, after a preliminary screening, a smaller number for detailed appraisal. In any case, an appropriate level of consultation should be undertaken as best practice, either formally or informally, in creating a set of alternatives.
Step 1: Identify, quantify and value the costs and benefits of each alternative
A critical step in the CBA process involves identifying, quantifying and valuing the costs and benefits of each alternative. The types of benefits and costs will depend on the project.
Typical costs of a proposal would include:
• Initial capital costs;
• capital costs of any buildings, equipment, or facilities that need to be replaced during the life of the project;
• operating and maintenance costs over the period of a programme or project; and
• costs which cannot be valued in money terms (often described as
'intangibles').
Typical benefits of a proposal would include:
• benefits which can be valued in money terms, in the form of revenues, cost savings or non-market outputs; and
• benefits which cannot be valued in money terms (also described as
‘intangibles’).
Estimating the magnitude of costs can be difficult and will normally involve input from accountants, economists and other specialists.
16
Step 2: Calculate the Net Present Value
In CBA, the net social benefit (NSB), or the excess of total benefit over total cost, is represented by the net present value (NPV) of the proposal.
Before determining the value (or NPV) of a proposal, the costs (C) and benefits (B) need to be quantified for the expected duration of the project. The NSB is calculated by subtracting the cost stream from the benefit stream and is represented as follows:
NSB = B – C
The NPV of a proposal is determined by applying a ‘discount rate’ (discussed below) to the identified costs and benefits. It is necessary to ‘discount’ costs and benefits occurring later relative to those occurring sooner. This is because money received now can be invested and converted into a larger future amount and because people generally prefer to receive income now rather than in the future.
Valuing each alternative by calculating NPVs facilitates comparison between proposals that exhibit different timing of their benefits and costs. Programmes with positive NPVs generally indicate an efficient use of the community’s resources.
The NPV is calculated as follows:
Where all projected costs and benefits are valued in real terms, they should be discounted by a real discount rate. This can be estimated approximately by subtracting the expected (or actual) inflation rate from the nominal discount rate. If nominal (current price) values are used for projected costs and benefits, they should be discounted by a nominal discount rate.
The discount rate can also be varied to test the sensitivity of the proposal to changes in this variable and, implicitly, to the phasing of costs and benefits. Sensitivity analysis is discussed in STEP 3 below.
The Internal Rate of Return (IRR) is typically presented as supplementary information to the NPV. The IRR is the discount rate that will result in a NPV of zero. The project’s IRR needs to be above the benchmark discount rate for the project to be considered viable (financially or economically, depending on the nature of the analysis).
Step 3: Sensitivity analysis and dealing with uncertainty
The values of future costs and benefits on which the NPV is based are forecasts that cannot be known with certainty. While they should be forecast expected values, it is important to test the NPV for ‘optimistic’ and ‘pessimistic’ scenarios. This is achieved by changing the values of key variables in the analysis, such as the discount rate, costs and benefits, and measuring the impact of the changes on the NPV. This is known as sensitivity analysis and is a critical component of any CBA.
Where the NPV is shown to be very sensitive to changes in a variable, the analyst should check on the appropriateness and impact of this variable, and whether any changes to the design of the programme or underlying assumptions are warranted.
Uncertainties, or situations with unknown probabilities, that could have a significant impact on the project outcome should be clearly detailed in the report and, if necessary, monitored during implementation. When dealing with uncertain data, the expected value should be used. The expected value is the weighted sum of the likely outcomes (each outcome having its own probability of occurring). In order to attempt to quantify the likely impact, a probability may be assigned to a particular variable where dealing with uncertain data. These probabilities are then used as weightings in order to derive an expected value.
For example, assume a proposal that has two possible outcomes. The probability of producing an NPV of $5 million is 60% and the probability of producing an NPV of $3 million is 40%. We can now work out the expected NPV (ENPV) as follows:
ENPV = (0.6 x $5m) + (0.4 x $3m) = $4.2m
The expected NPV in this situation is $4.2 million. However, such a single value may not fully convey the uncertainty associated with forecasting the outcome. Hence, it is generally appropriate to present the results as a range that includes the most likely results, as well as results in possible best and worst case scenarios.
Reference: Mishan’s Cost-Bene t Analysis (1982, pp 221-224) provides a detailed explanation of the IRR, describes how to measure it, and provides an example to illustrate. See also Department of Finance and Administration the Handbook
of CBA (2005).
General Instructions:
1) Create a cost-beneift analysis spreadsheet for both in-house and outsourced development:
• Create s spreadsheet, format and use formulas to identify the cost-benefit analysis for alternatives.
• Visually show comparison by using graphs and charts.
• Give recommendations on which alternative is more beneficial to the organisation.
Note: students are required to input their own data.
Detailed instructions:
Note that the values in the tables provided are randomly added and may show incorrect values if formula is applied.
1. Create an Excel workbook with 8 worksheets (tabs): costs for in-house development, benefits of in-house development, costs for outsource development, benefits of outsource development, summary (inhouse and outsource), pivot table, and graphs, comparison and recommendation.
2. First workbook contains all the costs for in-house development. You will have two tables: First table computes the team rate, second table computes for the project total cost.
a. Create the project team rate table
It should look like this:
Project Team Rate
Units Low Medium High Chosen (Low)
Analysts 25 30 45 25
Software Arthictect 25 30 45 25
Junioe Developer 30 45 60 30
Senior Developer 50 70 90 50
Testing Lead 30 50 70 30
Tester 30 45 60 30
On-site Manager 115 150 180 115
Note: You have to enter values for the low, medium, high and selected (for the selected, you can choose from the values you entered for low, medium or high – does not have to be the same as high values from the high column)
Now you need to compute for the cost per hour and per day.
Note that the value for the per hour is based on the selected values column. Used referencing for the values in the per hour column. Per day is computed by multiplying the per hour to 8 (hours).
Project Team Rate
Units per hour per days
Analysts 25 200
Software Arthictect 25 200
Junioe Developer 30 240
Senior Developer 50 400
Testing Lead 30 240
Tester 30 200
On-site Manager 115 920
TOTAL TEAM RATE PER DAY 2400
TOTAL TEAM RATE (YEAR) 480000
3. Second Worksheet- Create the cost of in-house development table. Your spreadsheet should look like this (note that students are required to input their own cost data except for the project team salary which is based on the total team rate per day * 200 working days):
Note:
• You need to enter data for the cost of each item. The values shown above are just examples.
• Project team salary starts on the first year and is computed by multiplying the project team rate per day to 200 working days. The following years, the project team salary decreases by 10%.
• The first fiscal year is entered – rest of the fiscal year is computed by adding a year (for example, if year 2016 is entered in the first fiscal year, the rest of the four years will automatically be computer by adding a year from the previous year).
• Project total costs by year is the sum of all cost items per year (you need to use the formula to compute for this).
• Project total cost is the total money you need to spend on your project.
• You need to format your tables (you can design it the way you want). Make sure that appropriate formats are used (e.g. date format for dates, percentage formats or money formats)
4. Third Worksheet- contains the benefits of in-house development:
Note:
• You need to enter data for the benefit value. The values shown above are just examples.
• Fiscal year for Benefit sources is referenced to the first fiscal year in cost (if the year in the cost changes, the fiscal years in benefit sources automatically change too). Fiscal year for the 2nd to 5th year are automatically computed based on the year in the first fiscal year (one year is added on the previous year).
• Total Beneifts by year is the sum of all benefit sources per year (you need to use the formula to compute for this).
• Enhanced Revenues starts on year 4 and increases by 10% every year.
• Benefits Claimed for Analysis is computed using the following formula : total benefits per year * confidence factor.
• Project Grand Total Benefit is the total benefits for 5 years.
• You need to format your tables (you can design it the way you want). Make sure that appropriate formats are used (e.g. date format for dates, percentage formats and money formats)
5. The fourth worksheet contains outsourced cost and it follows the same steps and as Step 3. The only difference is that there is no project team rate computation table and the items for the costs are different. The fourth workbook contains the outsourced benefits and it follows the same step as step 3. In addition, the items for costs and benefits are different.
6. The fifth worksheet contains the benefits table for outsourced. The step is the same as step 4 except the items are different.
7. The sixth worksheet contains the summary of the cost-benefit analysis for in-house and the cost benefit for outsourced. You need to create two tables (one for inhouse and one for outsourced:
Note:
Fiscal year for Benefit sources is referenced to the first fiscal year in cost (if the year in the cost changes, the fiscal years in benefit sources automatically change too). Fiscal year for the 2nd to 5th year are automatically computed based on the year in the first fiscal year (one year is added on the previous year).
Values for yearly cost and benefits are referenced from the yearly cost and benefits (from cost table and benefits table of in-house)
Net cash flow is computed by subtracting the cost from benefits.
Enter the value Discount rate - this is the cost of money that determines the time value of you costs and benefits (example if you are working with an interest-free loan, this would be zero; a typical value is around 8%).
Base year is the current year; the year you want the future perspectives is computed
Year index is computed using the following formula: fiscal year – base year
Discount factor for each year is how much less the cash flows are worth because they are in the future. It is computed using the following formula: 1/((1+Discount Rate)^year index)
Costs for discounted flows cash per year is computed using the following formula: (-1) * undiscounted cost * discount factor
Benefits for discounted flows per year is computed using the following formula: undiscounted benefits * discount factor
Net is the sum of cost for discount flows and benefits for discounted flows.
Cumulative net value is the cumulative net value so far (example 2016 value is the same as the net value; 2017 value is cumulative value of 2016 +2017 net value and so on).
When the cumulative value becomes positive, you have completed your payback period.
Net Present Value is computed by using the NPV formula of following are the items for cost: = NPV(discount rate, net cash flow from 2017-2020,) + net cash flow for 2016
Internal Rate of Return is computed using the IRR formula of excel: = IRR(net cash flow from 2016-2020, 0.1)
Values for yearly cost and benefits are referenced from the yearly cost and benefits (from cost table and benefits of outsourced)
The 7th worksheet contains the pivot tables. Pivot tables are one of Excel's most powerful features. A pivot table allows you to extract the significance from a large, detailed data set.
8. The last worksheet contains graphs and recommendation:
• Create the graphs for the in-house and outsourced discounted cash flows:
Example graph shown below (note that you can decide what is the best graph to use to represent your data, use appropriate graphs):
• Create the payback graph for both in-house and outsourced (you can choose any chart you want, choose the most appropriate chart),
Example:
• Last graph is to compare the cost-benefit of inhouse vs outsourced (choose any representation you want). Identify the data that you want to compare. For example, if you want to just compare the net present value then you can show a graph like this:
If you want to include the IRR as part of the comparison, either you create a separate graph or combine it with the graph above.
Note that in the recommendation part using graphs, it is up to you to decide what data you want to present to make the recommendation. Once you have created all your graphs, write your recommendation on the worksheet and justify.
Learning Rubrics
Assessment Attributes Fail
(Unacceptable) Pass (Functional) Credit (Proficient) Distinction (Advanced) High Distinction (Exceptional)
Points
Formulae, formatting and cell references
40% Formulae, formatting and cell references are mostly incorrect and incomplete.
Some data have been added.
Points 0-14 More than 50% of the formulae, formatting and cell references are correct.
Most data have been added.
Points 15-20
More than 75 % of the formulae, formatting and cell references are correct.
All data have been added.
Points 21-30
Almost all formulae, formatting and cell references are correct. Very few errors
(around 1 -2 errors)
Cells are well formatted.
All data have been entered correctly.
Points 31-35 All formulae, formatting and cell references are correct (No errors).
Cells are excellently formatted and easy to understand.
All data have been entered correctly.
Points 36-40
Graphs and pivot table
40% No graphs nor pivot table or very poor implementation of
graphs and pivot table
Points 0-19 Graphs and/or pivot table are created with some errors (around 50%).
Graphs created are simple.
Points -20-25
Graphs and pivot table are created with minor errors
(around 3-4 errors)
Graphs and pivot table created are simple.
Points 26-30
Graphs and pivot table are
created with 1-2 errors
Graphs and pivot table created have some design and readable.
Points 31-35 Graphs and pivot table are created with no errors.
Excellent presentation of graphs and pivot table.
Points 36-40
Cost-benefit analysis recommendation
20% Recommendations and analysis are not provided or incorrect.
Points 0-9 Recommendations are provided but analysis was very shallow.
Points 10-12 Recommendations are provided but and some detailed analysis is provided.
Points : 12-15 Recommendations are provided and analysis is detailed.
Points 16-18 Thorough explanation of the recommendations is provided, and in-depth analysis is presented.
Points 19-20
ACCT6001 Assessment 3- Excel Spreadsheet 2018v2.docx Page 16 of
17

Editable Microsoft Excel Workbook
Worksheet Count: 3 worksheets


Buy Now at $19.99 USD
This above price is for already used answers. Please do not submit them directly as it may lead to plagiarism. Once paid, the deal will be non-refundable and there is no after-sale support for the quality or modification of the contents. Either use them for learning purpose or re-write them in your own language. If you are looking for new unused assignment, please use live chat to discuss and get best possible quote.

Looking for answers ?